Our company “Trema engineering 2”, Albania, which was created since 22 of October 2001, registration no. 26524 at Tirana Court, has been on the leading edge in providing comprehensive construction services (in accordance with the national or international regulations) including Design, Construction Management, General Contractor and competitive bids for a wide range of designing in both architectural, structural and construction  projects.With a separate design-build division, an estimated staff of professional architects, civil engineers, electricians, hydraulics and operators; with software packages such as: SAP 2000, CDS, TEKLA Structures 12.0, ARCHICAD, 3D STUDIO MAX, PHOTOSHOP and AUTOCAD (that enables our engineers and architect to calculate, design, simulate and compare rapidly a wide range of solutions); also with recent features (computers, plotters and printers etc.) our company has earned the reputation for providing the most complete and accurate construction services in the Albanian construction industry today. Our annual turnover for the last five years is respectively:Year 2011 - EUR   8,369,363  Year 2012 - EUR   7,481,014Year 2013 - EUR 11,172,270 Year 2014 - EUR 24,192,640Year 2015 - EUR 49,266,078  From the list of our main works during these years we can mention: Construction of New passenger Terminal, Mother Teresa Airport, Albania, including corporation on the architectural, structural and infrastructure facilities design, installation of equipment etc, design and build turnkey contract;
Construction of New Cargo, Mother Teresa Airport, design and built turnkey contract;Construction of Circulatory Roads, Parking Area, Mother Teresa Airport
Construction of commercial and residential 2-15 floor building, Sheshi “Karl Topia”, with a total construction area of 29,000 m2 including residential, commercial center and parking area;Construction of commercial and residential 12 floor building, Urani Pano Street, total construction area 20,000 m2 and parking area;Construction of Serious Crimes Court building, invested from European Community;Construction of several residential and commercial buildings, bridges roads etc. in Albania and Kosovo; Construction of  substations, over head lines and power distribution network;Architectural and structural designs of several residential edifices, pedestrian overpasses (steel structure).Construction of road Zerqan, Ura Qytetit Dibra Region and Meto Asim – Kafaraj Fier RegionConstruction Of Water Supply system in Bilisht & Bitincke, Korca RegionConstruction of the new pre-trial detention centre in Fier, Albania Lot 1 and Construction of new prison in Fier, Lot 2Construction of Access Roads and Bridges in Moglica, Devoll HPPConstruction of Hydro Power Plant Langarica (including tunnel)Civil Works for Fishing Port, DurresRehabilitation of 11 dams in Albania
On June 2007 we were certified for ISO 9001: 2000 and up to date we are using the Quality Management System Procedures of ISO 9001:2008. On 2014 we were certified on ISO 14001:2004; ISO 18001:2007; ISO 27001:2013; ISO 39001:2012; PASS 99:2012 and on 2016 we were certified for ISO 50001:2011.
Started from April 2008, STRABAG SE, a company incorporated and organized in accordance with the laws of Republic of Austria, with the registered seat at Austria, Villach, Triglavstraße 9, registered with Landesgericht Klagenfurt, under the registration number FN 88983 h, web site: www.strabag.com , bought 51% of the share capital of Trema engineering2. Today the company has two shareholders: Strabag with 51% of shares and Mr. Ilir Trebicka 49% of shares. The structure of the company is adapted regarding the European standards taking in consideration the Strabag’s strategy of using dual management model of one person in charge of technical and one in charge of commercial matters which can be found in all the management levels.Our company has the experience in working with FIDIC contract types. Our big investment is in respect that we show to all partners who have worked with us.   
Project Description The existing Stadium “Loro Boriçi” Shkoder is reconstructed in order to allow Albania National team games to be played in this Stadium. The Stadium capacity is increased to 16000 seats The pitch is reconstructed totally. The main and the south tribuneare done totally new; The tribune in east and north (Existing Tribune) is reconstructed. The stadium now have 10 new toilet blocks in the existing tribune (which did not exist before), 5 in the south tribune and 15 in the main tribune. A new perimeter road is constructed (~1850m2 of asphalted road and 1970 m2 in parking place) A new tile paved square is constructed in front and in north of the Stadium in order to allow parking (9500m2) The main tribune now has (5 floors and 1 underground) with a plot plan of about 6000 m2. To this part are now located the following areas (Team rooms; Coach rooms; Referee rooms; Doctor rooms; Team entrance to the pitch; toilet blocks; Technical rooms; Service rooms; Studio TV; Commentary rooms; Administration rooms; Catering, Conference room; Mix zone; VIP areas and Main tribune etc.) The south tribune consists of 5 Modules. Each of them will have a toilet block and Catering. To the Existing tribune are located the following areas (Club offices; Fitness and Aeroby, Wrestling; Weightlifting; Boxing; Athletics; Conference Room; Kitchen; Shops; Police; Fire department; Technical rooms; Toilet. A new front façade is constructed for all the stadium. The stadium access now is with automatic ticket control (Turnstiles). The stadium is surveyed by a new CCTV system. Fire detection and fire protection systems are installed in the main tribune. Air conditioning VRF system is installed also for the main Tribune        
Project DescriptionThe operations related to this contract include the following tasks: - Building Site Preparation - Intake Structure 1 on Uraka River - Headrace (from intake structure 1 to intake structure 2) - Intake Structure 2 on Meltmi torrent - In-tunnel Canal Section - Loading Tank - Penstock - River bed traverse upstream of the plant and section up to the building - Drainage - Power House Contract Value:             4,750,000 EURConstruction Period:   14 monthsEmployer:                     Prell Energy Sh.p.k 
Project DescriptionThe works consist to a series of rehabilitation measures on an existing earth embankment dam. - Provision of a new spillway structure. The works include: a new chute, a new flip bucket, and works to stabilize the left abutment slope - Slope stabilization works at two sections of the downstream shoulder of the dam via the provision of a downstream berm and slope re-profiling   works - Provision of upstream slope protection on the upstream section of the dam shoulder. - Crest re-profiling works. - Concrete repairs to and extension of an existing reinforced concrete parapet wall. The existing wall will need to be extended with a new reinforced   concrete wall. - Repairing works to an existing hydropower siphon pipe to prevent existing leakage from occurring. - Drainage works which include new berm drains and new mitre drains.- Minor access works and safety improvements, including a new footbridge access over the new spillway Contract Value:            6,596,443 EURConstruction period:   12 monthsEmployer:                     Ministry of Agriculture, Rural Development and Water Administration
Project Description The Works involve the construction of a new water transmission system for Prishtina which will convey raw water to and transport potable water from the Water Treatment Plant to be constructed through Component No. 2 of the Project. The Contract includes the supply, construction, installation, completion of the following Works: - Raw water intake from Iber Channel at Mihaliq; - Gravity pipeline DN1200 length approx. 9.0 km from Mihaliq to the pumping station at Millosheva; - Raw water pumping station at Millosheva; - Pressure main DN1200 length approx. 4.5 km from Millosheva to the water treatment plant Shkabaj; - Transmission pipes DN800 length approx. 3.8 km and DN800 length approx. 2.8 km to connect the water treatment plant to the existing reservoirs   Shkabaj and Arberia; - Gravity transmission main DN 500 to connect the water treatment plant with the (existing) pipeline to Obiliq, length approximately 650 m. Contract Value:            13,866,013 EURConstruction Period:   22 months Employer:                     Regional Water Company, Pristina Funds from:                  KfW